Railway wagon
Important Tooling and Special Equipment List  

Item

Process requirements

Equipments name

Specification

QTY

38

Paint film
Thickness detection

Coating thickness

0-1000

1

Digital coating thickness gauge

TT220

1

39

Bounds checking

Vehicle gauge

Nonstandard

1

Lower Bound

Nonstandard

1

40

Weight detection

rail weighbridge

GCS-180

1

41

Bearing Signs punch marking

SD-KD series rail logo
marking machine

SD-KDJ002

1

42

Cross-rod shaft bolts fastening

Electric Smart Trigger

ZZB-800D

4

43

The fastening for Bogie center plate, column wear plate

Intelligent Portfolio
Electric Trigger

ZZB-1000D

1

44

 

 

ZZB-800DC

1

45

Chute Wear plate assembly

Chute Wear Plate
Press-fit installation

Nonstandard

1

46

Electrode drying

Self-control far-infrared
Electrode drying oven

ZYHC-30

4

47

 

 

XZYH-60

2

48

Support Block Testing

Support Block Weld
Magnetic Flaw Detector

TCL-1

1

49

Coupler Tri-State
Trial

Coupler Tri-State
Test Bench

Nonstandard

1

50

Hook tail box, buffer assembly

Buffer device assembly of
hydraulic lifting trolley

Nonstandard

3

52

 

Rotary Riveting device

20

1

53

Brake cylinder assembly

Brake cylinder
Lifting Device

Nonstandard

4

Pre  1  2  3  4  5  6  Next

 
Contact Us

Add:TaiYuan City ,Shanxi,China

Zip: 030006

Tel: 86-0351-7026319

Fex: 86-0351-7026319

E-mail:

     sales@railway-vehicle.com

     taiyuanrailway@163.com


CopyRight(C)2009-2012 Taiyuan Railway Rolling stock Co., Ltd. All rights reserved.
E-mail:
sales@railway-vehicle.com     taiyuanrailway@163.com

Railway wagon-Home Railway wagon-About Railway wagon-Projects Railway wagon-Service Railway wagon-Contact hopper wagon side dump wagon flat wagon tank wagon open top wagon railway engineering work vehicle catenary work car TY4B invariable tensile force unrolling wagon Heavy rail car industrial diesel locomotive tunnel tow car railway electric locomotive railway rolling stock parts